Strategic technical engineered proposal (STEP)

STEP

BOTTOM ASH COMPONENTS

Experienced professionals provide on-site evaluation and inspection

  • Accurate and efficient inspections for planned or forced outage
  • Engineered evaluation consists of multi-level reviews including: physical inspection, immediate recommendations, and long term considerations
  • Physical report that includes: summary, evaluation, recommendations, and photographs from inspection
  • Reports generated by certified boiler engineer